Tuesday, September 18, 2012

Studio Build 25

Back to work!

It has been a great Summer of theater.  Merry Wives of Windsor at the Helderberg Theater Festival was a great success. The role of Falstaff won me my first TANYS (Theater Association of New York State) award for excellence in acting. Then from there I jumped right onto the Mac-Haydn Stage to play several character roles in State Fair.

Now that that's all wrapped up, we got back to THE STUDIO!

On Sunday we were able to tap into the return plenum of the air system and we dropped in a new 12"x4" return duct from the studio for airflow. The room already had a feed for heat and AC, but with the door closed, it had nowhere to go. 

The return is located right behind where the computer towers will be located, with the goal of sucking the heat from the towers right out of the room.

I didn't take a picture, because we all kind of know what a floor vent looks like. So next weekend we move INTO THE STUDIO!

We'll be doing an inventory as we go and dusting and cleaning gear before it moves in.  I'll also be labeling things along the way for clarity. If I don't need it, it doesn't move in. Plain and simple.

The door isn't 100% finished as of yet, I had to spend some money for marketing material and that overruled the cost of the cooler handle.  The studio is self funded, so we'll get there.  It's been a busy week for scripts, so it won't take long.  Stay Tuned.

No comments:

Post a Comment